切换
资源分类
文档管理
收藏夹
最新动态
登陆
注册
关闭
返回
下载
相似
相似资源:
IEA_renewables2022-report
光储直柔——未来建筑新型能源系统.pdf
新能源-光伏板块培训材料
光伏行业:2022光伏板块推荐逻辑-西部证券.pdf
上海证券-光伏行业2022年中期投资策略报告:需求高增,持续关注新技术与优质细分环节-220605.pdf
长江证券-能源行业全球龙头资本开支系列:资源类,走向转型-220602.pdf
2022年5月新能源产业链洞察:硅料供不应求,风机价格上涨-国信证券.pdf
光伏供需趋势展望.pdf
光伏行业6月展望:组件排产整体良好,国内电站需求值得关注-西南证券.pdf
整县推进下看分布式光伏商业模式创新
2021至2025年全球太阳能光伏发电市场展望.pdf
光伏建筑:碳中和背景下的建材新蓝海
大宗商品视角下的光伏产业系列专题之总量篇:能源转型,春“光”正好-中信期货.pdf
建筑光伏投资收益优,建筑企业拓展BIPV优势明显.pdf
建筑光伏风口已至,BIPV市场空间广阔.pdf
光伏行回顾与展望-王勃华.pdf
光伏、风电、储能等九大未来能源发展报告(未来能源2050规划与技术发展开展建议).pdf
光伏组件绿色回收政策和技术的进展与挑战
再生铝合金与废旧光伏边框前处理技术
碳中和背景下德国能效政策研究报告
普华永道-2021年中国能源行业并购活动回顾及未来展望:乘风、扬帆、起航“双碳”元年的能源投资-20220414
资源描述:
苏州赛伍应用技术股份有限公司 Cybrid Technologies Inc. MoProTM Solution About Cybrid and MoProTM No. 1 Global backsheet supplier since 2014, 33 market share in 2020 Introduced 1st MoProTM product, backsheet repair tape, in 2017 Has sold 2 mil m2 accumulatively. Module BS Crack( AAA) Module BS Crack Location Gansu, China Volume 50MW Operation 2011-now BS Type AXX( I) Module BS Crack Location Gujarat, India Volume 20MW Operation 2012-now BS Type AXX( I) Failure Cases of Backsheet 1 BS inner crack Project location CO, USA Volume 15MW Operation 2014-now BS type PXX( T) BS Inner Layer Crack Insulation/Wet Leakage Test Failure Module Degradation/Power Drop BS Inner Crack BS inner crack Project location Taiwan Volume 10MW Operation 2015-now BS type XPE( T) Failure Cases of Backsheet 2 15 Power Drop SOP 1) Operated by two people, place the whole piece of tape on the surface of the module back sheet, take out the wires of the junction box from the opening ; 2) Align four corners of the tape with the four top corners of the module, and pay attention to the distance between the tape and the silicone should be 5mm-10mm; 3) After the tape position is fixed, person A fixes the tape on one side of the module, person B lifts the whole piece of tape from the middle position and tears the release film on the other side along the cutting line, person A uses a customized pressure roller to Laminate uniformly from top to bottom; the other side of the same tape is laminated as above; BS Failure - Solution Apply a repair tape KPf based to the module as the 2nd backsheet. FIG.1 Whole tape size FIG.2 Appearance of the tape placed on module FIG.3 Appearance after tape fitting A B Delimitation induced by water vapor Location Anhui, China Volume 15MW Operation 2014-now Failure Cases of Glass-Glass Module Location Bangkok, Thailand Volume 5MW Operation 2016-now Use waterproof and UV-resist tape to seal module edges. Use self-curing dough to seal the corner area. 1. Clean surface around module, the bonding base surface is clean and free of oil, dust, and moisture; 2. Peal off release paper, and stick to the glass along the corner guard with the tape, the bonding place is firmly closed; 3. Use self-curing waterproof insulation packaging material to seal the gap between tape and corner guard. Glass-Glass Module Delimitation-Solution Self-curing Dough on Inverter Terminal and Hose Port Thanks THANK YOU
点击查看更多>>
收藏
下载该资源
京ICP备10028102号-1
电信与信息服务业务许可证:京ICP证120154号
地址:北京市大兴区亦庄经济开发区经海三路
天通泰科技金融谷 C座 16层 邮编:102600