返回 相似
资源描述:
APP iOSOfficial Website APP Android EH SERIES USER MANUAL HYBRID INVERTER TABLE OF CONTENTS 021.2 SAFETY Password admin Then click “OK” Click “Start Setup” to choose your router Then click “Next” 1. Fill in the password of the router, then click “Next” 2. Click “Complete” 10.10.100.253 AdminU Password OK CANCEL Remember the passwordR Device information Firmware verison MAC address Wireless AP mode SSID IP address Wireless STA mode Router SSID Encryption method Encryption algorithm Router Password Start Setup Cannot join the network, may be caused by router doesn t exist, or signal is too week, or password is incorrect Help Wizard will help you to complete setting within one mimute. 1.6.9.3.38.2.1.38 60C5A86033E1 Enable Solar-WiFi 10.10.100.253 Disable WiFi_Burn-in WAP/WAP2-PSK AES WiFi_Burn-in Add wireless network manually Network name SSID Encryption method Encryption algorithm Please enter the wireless network password Password 8-63 bytes show psk Back Next WiFi-Test WPA/WPA2-PSK AES hellogoodwe Note case sensitive for SSID and password Please make sure all parameters of wireless network are matched with router, including password Step 1 Step 2 Step 3 Back Complete Confirm to complete If you still need to configure the other pages of information, please go to complete your required configuration. Click Complete , the current configuration will take effect after restart. Configuration is completed, you can log on the Management page to restart device by Click on OK button. Save success Please select your current wireless network SSID Sec mode Enc type Channel RSSI WIFI Test WAP2-PSK AES 6 54 Back Next Note When RSSI of the selected WiFi Network is lower than 10, the connection may be unstable, please select other available network or shorten the distance between the device and the router. If your wireless router does not broadcast SSID, please click “Next“ and add a wireless network manually. Distribution box On-Grid Back-up Battery Solar Array Back-up Loads Normal Loads L N PE Meter L N L N PE L N PE L N PE E-N Link Smart Meter Don’t connect this terminal for Australian and New Zealand grid system RCD Grid N-BAR GoodWe EH Series Hybrid Inverter E-BAR BMS E-BAR The Grounding screw hole at the lower right corner RS485 RCD CT On-Grid Back-up Battery Solar Array Back-up Loads L N L N PE L N PE GoodWe EH Series Hybrid Inverter E-BAR BMS The Grounding screw hole at the lower right corner RCD Distribution box On-Grid Back-up Battery Solar Array Back-up Loads Normal Loads L N PE Meter L N L N PE L N PE L N PE RCD Grid GoodWe EH Series Hybrid Inverter E-BAR BMS E-BAR The Grounding screw hole at the lower right corner RS485 RCD Smart Meter CT * This diagram is an example for Australia,South Africa and New Zealand grid system. Distribution box Note After the inverter is installedand worked normal when the grid connected , please turn off the grid power to check whether the back-up function is normal, which can avoid the problems in subsequent uses. NoteThe back-up PE line and rack earth must be grounded properly and effectively. Other- wise the back-up function may be abnormal when the grid fail. INSTALLATION INSTRUCTIONS MAMUAL OPERATION Note 1. Please make sure the password, Encryption Method/Algorithm is right the same with the router’s. 2. If everything is right well, the Wi-Fi LED on inverter will change from double blink to quartic blink then to solid status, which means Wi-Fi is connected to GoodWe icloud successfully. 3. Wi-Fi configuration could also be done on PV Master, details please check on PV Master APP. Note For Australia safety country, the neutral cable of On-Grid side and Back-Up side must be connected together, otherwise Back-Up function will not work. System Connection Diagrams 14 MAMUAL OPERATION OTHERS 19 20 OTHERS04 PV Master is an external monitoring/ configuration application for GoodWe hybrid inverters, used on smart phones or pad for both Android and iOS system, main functions as below 1. Edit system configuration to make the system work as customer needs. 2. Monitor and check performance of the hybrid system. 3. Wi-Fi configuration. Please download PV Master OPERATION INSTRUCTIONS from www.goodwe.com Note GoodWe will keep right to explain all the contents in this user manual. To insure IP65, inverter must be sealed well, please install the inverters in one day after unpacking, otherwise please seal all unused terminals/holes, not allowed to keep any terminals/holes open, confirm there is no risk to have water  201-DOD /2 100W 100W Inverter 100W EH EH EH EH 33 34 35 36 2 B 5 33 34 35 36 36 Note For compatible lithium batteries, BMS status is “Communication OK“ after selecting the right battery stype. OTHERSOTHERS 4.4 TECHNICAL PARAMETERS AND CERTIFICATES TECHNICAL PARAMETERS OF HYBRID CONVERTERS 25 26 EH EH EH EH EH EH S Off-Grid Output Switch Off-Grid Output Switch H AFor EH series inverter, it could connect Lithium batteries which have compatibility with EH series inverter. With nominal voltage from 85V to 450V. Compatible lithium batteries can see on battery list in PV MASTER APP OTHERS OTHERS 27 28 TECHNICAL PARAMETERS OF EH INVERTER Technical Data Battery Type Battery Input Data Battery Voltage RangeV Start-up Voltage V Max. Charging/Discharging Current A Max. Charging/Discharging Power W PV String Input Data Max. DC Input Voltage V Max. DC Input Power W MPPT Range V Start-up Voltage V MPPT Range for Full Load V Nominal DC Input Voltage V Max. Short Current A Max. Input Current A PV Overcurrent Protection A PV Back-feed Current A No. of MPP Trackers No. of Strings per MPP Tracker Nominal Apparent Power Output to Utility Grid VA Max. Apparent Power Output to Utility GridVA Max. Apparent Power from Utility Grid VA Nominal Ouput Freqency Hz Nominal Output Voltage V Max. AC Current Output to Utility Grid A AC Output/Input Data On-grid Max. AC Current From Utility Grid A Output inrush Current peak/duration Input Inrush Current Peak/Duration Maximum output RMS overcurrent protection A AC Backfeed CurrentStandby mode A Output Power Factor Output THDi Nominal Output GW6000-EH 90 250550 21/21 0 4600/5000/6000[1] 52.2 65A, 5µs 65A, 5µs 0 8000 100550 4600/5000/6000/6600[3] 12000 Charging 6kW backup output 6kW 10000 Charging 5kW backup output 5kW 7200 Charging 3.6kW backup output 3.6kW 580 GW5000-EH Li-Ion 85450 90 25/25 6000 5000 3600 90 210550 15.2/15.2 12.5/12.5 21/21 0 2 1 4600/5000[2] 230 50/60 21.7[6]/26.1/28.7[7] 21.7/24.0[8] 16/18.0[9] 43.4 65A, 5µs 65A, 5µs 0 Adjustable from 0.8 leading to 0.8 lagging 3 6650 100550 4600/5000/5500[4] 580 GW3600-EH 90 150550 380 380 380 21/21 0 3600 32 65A, 5µs 65A, 5µs 26.1 21.7 16 0 4800 100550 3600/3960[5] 580 Max. Output Apparent Power VALinear Load Back-up Output Data UPS Peak Output Apparent Power VA* Max. Output Current ALinear Load Automatic Switch Time ms Nominal Output Voltage V Linear Load 6000 720060sec 26.1 5000 600060sec 21.7 10 230 ±2,single phase 3600 432060sec 15.7 Technical Data Nominal Ouput Frequency HzLinear Load Back-up Output Data UPS Output inrush Current peak/duration Maximum output RMS overcurrent protection A Back-Up Over Current Protection A Output THDv Linear Load Efficiency PV Europe Efficiency PV Max. Efficiency Battery Charged By PV Max. Efficiency Battery Charge/discharge From/To AC Max. Efficiency GW6000-EH 31 GW5000-EH 50/60 ±0.2 65A, 5µs 26 65 3 96.6 97.6 98 97 GW3600-EH 19 Cooling Noise dB User Interface Communication with BMS Communication with Meter LED G99/1; CEI 0-21 VDE4105-AR-N IEC/EN62109-1 followed 2.4 torque instruction. OTHERS
点击查看更多>>

京ICP备10028102号-1
电信与信息服务业务许可证:京ICP证120154号

地址:北京市大兴区亦庄经济开发区经海三路
天通泰科技金融谷 C座 16层 邮编:102600